SALIENT FEATURES OF NOAPARA - KAVISUBHAS SECTION UNDER OPERATION

Features

Details

Cost of Project

<!--[if !supportLists]-->(i)<!--[endif]-->Dum Dum – Tollygunge:Rs. 1716.95 Cr.

<!--[if !supportLists]-->(ii)<!--[endif]-->Tollygunge – New Garia:Rs. 1092.08 Cr.

<!--[if !supportLists]-->(iii)<!--[endif]-->Dum Dum – Noapara:Rs.182.24 Cr.

Total:Rs.2991.27 Cr.

Year of original Sanction

1972

Route Length for Commercial operation

27.198 Km. (Double Line) from Dum Dum to KaviSubhas.

<!--[if !supportLists]-->(i)<!--[endif]-->Underground: 13.458 km.

<!--[if !supportLists]-->(ii)<!--[endif]-->Viaduct: 11.243 km

<!--[if !supportLists]-->(iii)<!--[endif]-->On surface: 2.497 km

Number of Stations

24

<!--[if !supportLists]-->(i)<!--[endif]-->Elevated: 7 Nos.

<!--[if !supportLists]-->(ii)<!--[endif]-->Underground: 15 nos.

<!--[if !supportLists]-->(iii)<!--[endif]-->On surface: 2 nos.

Maximum permissible speed

55 KMPH

Minimum radius of curvature in block section

200m

Length of Platform

165 to 177m

Traction (Electric)

750 V DC 3rd Rail Current collection system

Signaling System

Automatic Signaling

Type of Track

Ballastless with M1A track fittings.

Distance between Stations

Average: 1.14 km

Maximum: 2.151 km (Dum Dum – Belgachia)

Minimum: 0.597 km (Central – ChandniChowk)

Type of Rakes

AC & Non-AC

No. of coaches per Rake

8 Coaches

Rake capacity

(Dense Crush Load)

2744 Passengers in AC Rake

2660 Passengers in Non-AC Rake




Source : Metro Railway Kolkata / Indian Railways Portal CMS Team Last Reviewed on: 08-05-2014